Client
Vår Energi
When
2020 -
Duration
Ongoing
Joint venture ISO contract with Vår Energi together with ISONOR Industrier before we now has merged into StS-ISONOR.
The work includes Rope access, Scaffolding, Surface treatment, Insulation. Currently we are working at Balder on a CUP (Corrosion Under Piping) project. At Goliat we are currently installing fireboxes. Surface protection project including repairing the exterior of the LQ. Fall protection rescue team with 3 man team on all rotations
We have personell in all our disiplines at Goliat, Balder and Ringhorne. Jotun A is in for upgrades at Yard and plan to be back on-site in 2024.
More projects
Engineering / Surfaceprotection
Sandblasting of Drain tank with robot
Engineering / Insulation / Prefabrication / Passive Fire Protection
Passive Fire Protection
Industrial scaffolding / Welding habitat / Insulation / Surfaceprotection / Industrial rope access
Gjøa
Architect and Interior / Insulation
MF Lysøy
See all projects